We made plans in the spring of 2019 to
have a stone retaining wall built along our western
property line. The ground here was very rough over
the top of our raised bed septic system and tapered very
unevenly toward the property line. It was very
difficult to mow and even though we had flowers and
ground cover over the tapered section, it was not at
aestetically pleasing.
The first phase of the project was to
have seven trees on our side of the property line
removed. The pictures here show that.
Unfortunately, the wall construction was
to be done by the same contractor but he backed out. We
made arrangements with a different contractor in the
fall and that worked was done in the spring of 2020.
That can be seen here.
|