Building the addition ... Phase
1 ... part 2
- June 22 ... concrete was pumped into the Arxx blocks for the ground
floor walls
- June 25 ... P & M did the prep work for the cellar floor
- June 26 ... Barksdale Construction put down the heating tubes for
the cellar floor
- June 28 ... the cellar floor was poured and the drain pipe was
placed around the foundation, stone was placed and some back-filling
was done
Continue to page 3
Hover on any of the thumbnails and a larger image will appear. Do
not click on the thumbnails. That will take you to a new page with
just the picture and slow things down!
|