Building the addition ... Phase 1 ... part 2

  • June 22 ... concrete was pumped into the Arxx blocks for the ground floor walls
  • June 25 ... P & M did the prep work for the cellar floor
  • June 26 ... Barksdale Construction put down the heating tubes for the cellar floor
  • June 28 ... the cellar floor was poured and the drain pipe was placed around the foundation, stone was placed and some back-filling was done