Building the addition ... Phase 1 ... part 3

  • July 3 ... P & M came back and finished preparation of the garage floor ... a tree crew contractor for National Grid (Asplundh) was also here cutting trees to make way for the relocating of the neighbor's entrance wire
  • July 5 ... Barksdale Construction was here and put down the heating tubes for the garage floor
  • July 9 ... National Grid was here and installed a new pole on our line with Hansons and re-routed their supply feed
  • July 10 ... P & M poured the garage floor
  • July 11 ... Asplundh tree crew was here and did some more trimming

On to the building phase

Hover on any of the thumbnails and a larger image will appear.  Do not click on the thumbnails.  That will take you to a new page with just the picture and slow things down!

©2012

Reproduction of this World Wide Web Site in whole or in part is prohibited without permission. All rights reserved.
 Trademarks and copyrights are the property of the respective owners and may not be used without permission.

Website design, maintenance and hosting by David J. Schryver